The CMS Radiation Monitoring Programme
The BCM system The BSC System On-line Dosimeters Passive Dosimeters RAMSES RADMON Monitoring Interface
Date of last update was 14/08/2006 15:24
BRM link on CERN agenda server. Click here
For a short overview of the radiation monitoring programme, please see the planning document. Click here
For and overview of the CMS radiation field please see:
Simulation results of the CMS Radiation field
Fluxes UXC, Charged particle, Neutron
Dose after 500fb-1. (It is assumed that this is the dose accumulated in 5.107sec= 10 years running)
Activation after 10 years running and 1 day of cool down. Click here
BRM talk at Machine Interface session, Chamoix XV Click here
BRM talk at Machine Interface session, Chamoix XV Click here
Pixel Mechanical Integration EDR Draft presentation and Draft of closeout remarks
Documentation
Sensors
Example collection distance plot from CMS Characterisation stand
QA specifications and procedure.
Excel spread sheet of diamond samples. Click here
18/2/2006 CDF poly sensors with response to beam abort Click here
Cabling and Services
Overview
Optical Cable overview. Click here
Cabling Spreadsheet. Includes cable lengths/costs etc. Click here
Optical Cables
Electrical Cables
Cables
Multi Service cable. Here are the 3 different choices we have for a Multi service cable that goes from the power supplies to PP0 on the tracker bulkhead.
BSC Cable (16 shielded twisted pairs) Click here and the alternative
Polyimide twisted pair See here
Connectors
Patch Panels
Cooling Pipes
Optical Cable overview. Click here
Power supplies
4603 (The pixel power supply) See the documentation on the 4601
Rack Assignments
CMS Rack Wizard. Click here
Ceramic baseplates
Prototype design. Click here
BCM_L: leakage current monitoring
Front end electronics
Cabling
Grounding and Shielding
Backend Mezzanine card
BCM_F: Fast Monitoring
Backend DAQ
BLM (Uses DAB64)
DAB64 VME Board
Optical Ribbon for FEC/FED. Note default version is the Pixel version.
Mechanical Design:
All mechanical designs are to be found in the BRM EDMS area. EDMS
Overview
BCM1
BCM2
Integration
BCM1
Motion Envelopes
BCM2
Detailed 2D drawing (1/1 scale) of BCM structure in relation to FWD pixel service tube. Click here
Testbeams
Schedule and Resources
Planning
Organisational flow chart
FWD Pixels drawings relevant to the BCM. (From B. Gobbi and I. Fang)
Pictures for Bruno, Ingrid and John. Click here
Link to FPix document server. Click here
Link to files for BCM-FPix meeting. Click here
Tracker Model in *.stp file format (75 MB ) - Click here
People
Overall project: Alick Macpherson Ph +41 22 767 4832
Diamond sensors Bob Stone Ph +1732 445 4352
Mechanical structure Nuno Rodrigues Ph+351964437800
The front end amplifier chain Richard Gray
Opto hybrids and cabling Alick Macpherson
Back-end DAQ To be determined
Machine interface To be determined. Work in conjunction with RADMON.
The BSC System (Beam Scintillator Counters)
Steve's Assessment. Click here
BSC envelope. Latest version: V1.0. 3D picures Click here. 3D AutoCAD model. Click here.
Readout.
Digital opto-hybrids as radiation monitors.
Silicon pin notes for calibration crosscheck
CMS requirements for passive monitors
Link to PH-DT2 page on LHC approved active and passive monitors
TLD devices. Click here
Alanine. Click here
Location of Ramses monitors in the CMS cavern. Click here
Link to the RAMSES webpage
Overview of RAMSES. Click here
Link to the RAMSES measurement devices specifications. Click here
RADMON boxes
Location on HF. Click here
Proposal for location of RADMON boxes in the CMS cavern
Link to the RADMON webpage
Radiation Monitoring Interface
FESA.
The CMS DCS
Enquiries: Contact Alick Macpherson